• Cursos
  • Compilador de Código
  • Discutir
  • Preços
  • Teams
Menu
+ 1

Is there any list of python problems/projects we colud use practice?

Since doing and practicing is the best way, it would be great to have a per module list of problems to practice the learned on each one.

pythonprojectsproblems
21st Sep 2017, 4:31 PM
Eudy Veras
Eudy Veras - avatar
1 Resposta

Costuma ter perguntas como essa?

Aprenda de maneira mais eficiente, de graça:

  • Introdução ao Python

    7.1M de alunos

  • Introdução ao Java

    4.7M de alunos

  • Introdução ao C

    1.5M alunos

  • Introdução ao HTML

    7.5M alunos

Ver todos os cursos
Quente hoje
Hofstadter a sequence code coach is not running
0 Votes
the code for bigneer is not really what to do after coding begeneer in sololearn
0 Votes
Input errors (python)
1 Votes
Vote Code
1 Votes
What’s the actual difference between MB and GB in real-world usage?
1 Votes
Without degree job
0 Votes
Script file names
0 Votes
I wanna know is that what about dot net developers in future there is possible they gonna downfall in industry
0 Votes
Je cherche des gens qui parle français pour apprendre le langage c
0 Votes
How can I add gradient to the background
1 Votes